{"id":450,"date":"2009-08-22T12:15:46","date_gmt":"2009-08-22T16:15:46","guid":{"rendered":"http:\/\/www.rakkar.org\/blog\/?p=450"},"modified":"2009-08-22T12:15:46","modified_gmt":"2009-08-22T16:15:46","slug":"getting-bids-on-a-new-project","status":"publish","type":"post","link":"https:\/\/rakkar.org\/blog\/index.php\/2009\/08\/22\/getting-bids-on-a-new-project\/","title":{"rendered":"Getting bids on a new project"},"content":{"rendered":"<p>\t\t\t\tI have a new project I&#8217;m working on. I wrote a 15 page detailed design document. I then decided to spend a week finding bids.<\/p>\n<p>Roughly:<\/p>\n<p>5 companies didn&#8217;t respond at all<br \/>\n5 responded with they couldn&#8217;t do it<br \/>\n2 responded, but mentioned they charge $2000 a day<br \/>\n1 responded with a rough estimate, and a high price, and asked me if I wanted to continue<br \/>\n3 Signed the NDA and came back with a quote, without further communication<br \/>\n1 Signed the NDA, actually spoke to me by email over several days to clarify it, and came back with a quote<br \/>\n3 got the requirements document, but I never heard back again. They are probably studying it, unaware that spending more than a couple of days to answer means they lost the bid.<br \/>\n2 were extremely slow to respond, where it took the whole week to even sign the NDA<br \/>\n1 immediately wanted a phone meeting, without even looking at the requirements document. After sending the requirements document, they wanted a meeting again, without stating why.<\/p>\n<p>The company that clarified the requirements document was my first choice, but couldn&#8217;t do it for various reasons. So I&#8217;m going to go with one of the companies that just placed a bid. Payment is for completed work only, so there&#8217;s no risk or cost to me other than wasted time.<\/p>\n<p>Generally, the small companies were the ones that came back with bids or comments. The large companies were slow to respond, and either wanted a meeting or were so slow to respond I haven&#8217;t heard from them by now, and won&#8217;t wait any longer.<\/p>\n<p>Is it unreasonable to expect to get a quote within a week&#8217;s time?<\/p>\n","protected":false},"excerpt":{"rendered":"<p>I have a new project I&#8217;m working on. I wrote a 15 page detailed design document. I then decided to spend a week finding bids. Roughly: 5 companies didn&#8217;t respond at all 5 responded with they couldn&#8217;t do it 2 responded, but mentioned they charge $2000 a day 1 responded with a rough estimate, and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"_links":{"self":[{"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/posts\/450"}],"collection":[{"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/comments?post=450"}],"version-history":[{"count":0,"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/posts\/450\/revisions"}],"wp:attachment":[{"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/media?parent=450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/categories?post=450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rakkar.org\/blog\/index.php\/wp-json\/wp\/v2\/tags?post=450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}